Red tape is strangling this country [
!] I recently applied to put a new bridge over the dyke, at the end of the field. The planners wouldn't accept the application, till I provided a flood risk assesment, which must be carried out by a qualified person.
£550+vat later, a 26 page document arrived by email. Basically in summing up, the highly qualified person stated that, "if the bridge is constructed at a level, higher than the maximum flood level, it would not cause any risk to flooding". Now why didn't I think of that :I