finally much later than dad predicted the welding is finally finished after i found 2 more holes 1 in the drivers side front pillar at the bottom and another in the passenger side front pillar by the windscreen the repaired sills valences and everything else has been welded shut and the vacant internal space leatherd with preventative wax. the paint is completely stripped including under the peak (thats a rite sod to do). aby dents dinks divets or other blemishes have been filled and smooted so next week it shall be primerd and flatted back then painted as well as the few remaining little bits left to do to the panel van so we could be looking at 2 done in about 3 weeks touch wood.
rich
rich